Seismic Retrofit and Remodel
Saratoga, CA
Fee for the stamped drawings and calculations:
~$4200Turnaround time to deliver the structural plans:
4 weeksTime until permit approval:
3 months
Project Scope:
Modified structural framing system to suit new interior layout
Provided full voluntary seismic strengthening for the entire 1-story house
