Legalization of Detached Garage​

Richmond, CA​
Fee for the stamped drawings and calculations:
~$3000
Turnaround time to deliver the structural plans:
3 weeks
Time until permit approval:
2 months
Project Scope:

Conducted an onsite evaluation of a detached garage that was previously built without a permit​

Legalized the unpermitted detached garage by preparing structural drawing and calculation sets for City approval​