Legalization of ADU​

Woodside, CA​
Fee for the stamped drawings and calculations:
~$2800
Turnaround time to deliver the structural plans:
3 weeks
Time until permit approval:
1 month
Project Scope:

Legalized an unpermitted 1-story ADU by preparing full structural drawing and calculation sets for City approval​

The ADU includes a bedroom, bathroom, and mini workshop​