Garage Conversion into ADU​

Palo Alto, CA​
Fee for the stamped drawings and calculations:
~$3500
Turnaround time to deliver the structural plans:
3 weeks
Time until permit approval:
2 months
Project Scope:

Converted an existing detached garage into a new 1-story custom ADU​

Designed structural drawing and calculation sets for the full foundation, floor framing, lateral resisting system and roof framing​