Structural Repairs for Basement​

Belmont, CA​
Fee for the stamped drawings and calculations:
~$4000
Turnaround time to deliver the structural plans:
3 weeks
Time until permit approval:
2 months
Project Scope:

Performed onsite structural evaluation on the cracks in walls and water damage of the basement of a 2-story home​

Provided structural design for the basement and seismically strengthened the entire building​