Structural Repairs for Basement
Belmont, CA
Fee for the stamped drawings and calculations:
~$4000Turnaround time to deliver the structural plans:
3 weeksTime until permit approval:
2 months
Project Scope:
Performed onsite structural evaluation on the cracks in walls and water damage of the basement of a 2-story home
Provided structural design for the basement and seismically strengthened the entire building
