New ADU Construction​

Emeryville, CA​
Fee for the stamped drawings and calculations:
~$3600
Turnaround time to deliver the structural plans:
3 weeks
Time until permit approval:
3 months
Project Scope:

Prepared complete structural design for a 2-story custom ADU, including full foundation, floor framing, lateral resisting system and roof framing​