Foundation Strengthening
San Jose, CA
Fee for the stamped drawings and calculations:
~$3500Turnaround time to deliver the structural plans:
3 weeksTime until permit approval:
2 months
Project Scope:
Performed onsite evaluation on cracks in the foundation
Provided structural plans to repair and strengthen the foundation of the 1-story home
