Addition and Alteration
Tracy, CA
Fee for the stamped drawings and calculations:
~$3200Turnaround time to deliver the structural plans:
3 weeksTime until permit approval:
2 months
Project Scope:
Prepared structural design for wood framing system, lateral resisting system and foundation for a 770 sqft addition, which includes a master bedroom, a master bathroom, an additional pantry and a mud room
